Public City Design
The recovered integrated Blender master passed Gate 027. The published public geometry contains 120 selectable canonical cell proxies. Engineering sizing, authoritative CRS/datum, wider P5 system-node IDs and P6 quantitative acceptance remain on hold. Geometry is a reference, not measured city performance.
REFERENCE ≠ ACTUAL ≠ FORECAST ≠ SCENARIO. Gate 028 OPEN · RC1 NOT ACCEPTED · Production 0/220.
