Skip to content
SLMSSovereign Living Metropolitan SystemWATCH THE CITY THINK

Reference briefing · private preview

Operations, Assets & Service Continuity — stakeholder insights

Are assets available, maintained and renewed before defects become service failures?

Open the interactive Operations, Assets & Service Continuity dashboard →

Asset managers

How much reference renewal need remains unfunded each year?

72% of reference renewal need is funded; the annual gap is 0.28 bn/yr.

Citywide reference · not an observed reading or a local allocation

Evidence needed before a decision

Actual uptime, maintenance condition and recovery performance require dated operational evidence.

Service operators

What proportion of reference renewal need is funded?

72% of reference renewal need is funded; the annual gap is 0.28 bn/yr.

Citywide reference · not an observed reading or a local allocation

Evidence needed before a decision

Actual uptime, maintenance condition and recovery performance require dated operational evidence.

Improvement leaders

What reference mitigation difference should be tested in practice?

The matched mitigation example reduces expected annual loss by 0.3 bn/yr. It does not establish an observed saving.

Citywide reference · not an observed reading or a local allocation

Evidence needed before a decision

Actual uptime, maintenance condition and recovery performance require dated operational evidence.

Read the evidence with the insight

These are the existing citywide reference calculations. They are not observed outcomes or allocations to a district, neighbourhood or facility. The interactive dashboard exposes each measure’s source, units and calculation. Scenario changes remain modelled outputs.

Continue to the related dashboard briefing →